dafabet sports Description
The dafabet sports primarily comprised the construction of a 12 MIG potable water reservoir, pump house, control building, 18-point tanker-filling station, emergency tanker-filling station, and other facilities (lagoon, chlorination building, and guardhouse), along with landscaping and installations of all internal piping
ECG conducted dafabet sports Control Study to assess the dafabet sports impact on Mekaines RPS site, and provide mitigation plan to eliminate the potential risks of dafabet sports accumulation within the project site. The proposed dafabet sports Mitigation System for the studied area is an infiltration Swale System, to collect and infiltrate the surface runoff into the soil and prevent flooding towards the project site. The system caters for approximately 73.0 ha of rural catchments submitted to Kahramaa.
The catchment hydrograph, generated from HEC-HMS software model, is used to develop a two-dimensional model in order to define the dafabet sports plain limits in the flow scenarios.
Activities
- Infrastructure and Utilities
Scope
- Detailed design
- IFC (Issued for construction)
- Design permits
Client
HLG
LOCATION
qatar
,dafabet sports sheet
share this dafabet sports