Project Description
Located 5 km west of Al-Wakrah, the project area of Al-Wukair straddles Al-Wukair Street. The QS049 project (3 contracts) serves a predominantly residential community spreading over an area of 2,300 ha; as a part of Zone 91 masterplan. It includes approximately 9,726 residential plots, 1,600 commercial plots, 4 schools, 3 reserved government plots, 21 mosques, 13 parks and 226 open space / green areas.
dafabet casino of Al-Meshaf (Package 01) covers an area of 117 ha and encompasses a 6 km trunk main with diameters ranging from 2000 mm to 2400 mm along Al-Wukair Street.
The scope of works includes:
• Complete dafabet casino of Foul Sewer Network for Zone-1 and Zone-2
• Complete dafabet casino of Foul Water Tunnel with associated shafts
• Hydraulic model (INFO-works ICM)/dafabet casino calculations
• Utility clash analysis
• Authority dafabet casino review approvals (QDRS)
• Structural dafabet casino of temporary/ permanent micro-tunneling shafts
• Geotechnical review for evaluation of sub-surface conditions and determination of dafabet casino parameters
• Slope Stability Analyses
• Proposed Dewatering Lagoon
Activities
- Drainage Network dafabet casino
- Foul Network dafabet casino
- Geotechnical Investigation Review
- Hydraulic Modeling
- Structural dafabet casino
Scope
- dafabet casino validation
- Detailed dafabet casino
- Construction documents
Client
SACYR – MEDGULF JOINT VENTURE
LOCATION
qatar
,project sheet