Dubai Electricity & Water Authority (DEWA) constructs Meydan substation (132/11 kV) located in Wadi Al-Safa (3) on a plot area of around 4,163m2.
With a built-up area of 4,095m², the substation includes a main building (B+G+1) with a height of 17 metre, in addition to three ancillary dafabet mobile app for the fire pump, security and earthing transformer.
dafabet mobile app’s scope involves detailed design, construction supervision and design permits.
date
Apr 13, 2017
share