Dubai Electricity & Water Authority (DEWA) constructs MBR Solar Park substation (400/132 kV) located in Saih Al Dahal. The substation contains three main buildings (B+G) with a height of 17 metre, a control building as well as two ancillary buildings for fire pump and security.
Dafabet promo code’s scope covers construction supervision and design permits.
date
Apr 13, 2017
share