The objective of the project is to construct a new 3-lane dafabet casino (90km length and 11.7m width) connecting El Sheikh Fadl Village to Ras Ghareb City, and to upgrade the existing dafabet casino as well as the median strip including the carriage way, shoulder and verge. The project encompasses circulation plan; typical U-turns; dafabet casino marking & signage; pavement layers; and street lighting.
dafabet casino’s scope involves topographic survey, geotechnical investigation, detailed design and preparation of shop drawings.
date
Apr 13, 2017
share