Project Description
Over a total land area of 5,600 m2, the dafabet comprise a new management building, auditorium building, existing building (remodeling), and substation. The 220-person auditorium is devoted to GASCO Bu Hasa Oil Field staff with a total built-up area of 1,050 m2. dafabet components comprise a foyer, a main hall, male/female restrooms, and service rooms.
The auditorium is also provided with a state-of-the-art audiovisual system that delivers multimedia and distance delivery facilities.
Additionally, the project involved the dafabet of a LEED-certified management building housing GASCO’s administrative staff with a total built-up area of 2,000 m2. Both management and auditorium buildings are served by an auxiliary building hosting chillers, a substation, and a pump room. dafabet designs secured streamlined functionality, seamless constructability, and cost- effective maintenance requirements.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Landscaping
- Mechanical
- Roads
- Structural
Scope
- Conceptual design
- Design dafabet
- Detailed design
- Schematic design
- Tender documents
Client
Abu Dhabi Gas Industries Ltd. (GASCO), UAE
LOCATION
abu-dhabi