Project Description

Cairo International Airport Terminal Dafabet promo code no deposit 2 has undergone major expansion aimed at doubling its annual passenger handling capacity to 7.5 million passengers. The USD 400 million project was financed by the World
Bank.
With a built-up area of 228,000 m², the project involved the demolition of the existing Dafabet promo code no deposit and construction of a new larger terminal, as well as construction of new airside and landside pavements, with a pavement area
exceeding 300,000 m².
The Dafabet promo code no deposit now operates at a baggage handling
capacity of 3,000 bags/hour, with early baggage storage,
seven baggage reclaim carrousels, 51 metal detectors,
and 58 X-ray units. The Dafabet promo code no deposit houses the latest airport
technologies and systems. Cairo International Airport Terminal Dafabet promo code no deposit 2
Cairo International Airport Terminal Dafabet promo code no deposit 2 Renovation Program
The construction of new facilities includes the following:
• Airside external work: earthwork, asphalt and concrete hard stands, civil works for potable water and sewerage networks, firefighting networks, storm drainage networks, fuel networks, as well as electromechanical works for
airfield lighting, apron flood lighting, in addition to different utilities’ networks.
• Dafabet promo code no deposit (A): 5 floors with a built-up area of approximately
79,000 m2.
• Dafabet promo code no deposit (B): 5 floors with a built-up area of approximately
102,000 m2.
• Dafabet promo code no deposit (C): 5 floors with a built-up area of approximately 47,000 m2; and comprising 14 contact air gates, 28 passenger boarding bridges and 40 – room airside hotel.
• Landside external works: external utilities such as potable water, sewerage, firefighting, storm drainage and irrigation networks. External works also include asphalt roads and car parking with a total Dafabet promo code no deposit approximately 16,000 m2.
• Reconstruction of the existing power plant Dafabet promo code no deposit: power supply including connection with existing Terminal Dafabet promo code no deposit 2 power and distribution network through transformers and substations. Terminal Dafabet promo code no deposit 2 shall be
provided with 3-phase 11 kV, 50 Hz power supply from the existing Dafabet promo code no deposit power plant.

Activities

  • Airfield lighting
  • Architectural
  • Baggage handling system
  • Civil Works
  • Communications and security systems
  • Electrical
  • HVAC
  • Infrastructure
  • Interior Design
  • Mechanical
  • Passengers Boarding Bridges
  • Structural

Scope

  • Conceptual design
  • Construction management
  • Construction supervision
  • Detailed design
  • Master plan
  • Tender Action
  • Tender documents

Client

Dafabet promo code no deposit Airport Company (CAC)

LOCATION

egypt

,

Dafabet promo code no deposit

,

project sheet

Download File (pdf 1473KB)