Project Description
The extensive developments currently under way across the State of Qatar create surging demand for potable water production. Such a fast-growing demand on potable water, as well as emergency potable water, can only be fulfilled through the implementation of water Dafabet Casino online projects.
The Qatar General Electricity & Water Corporation (Kahramaa) has thus planned the construction of a Dafabet Casino online plant at Qatar Economic Zone 3 (QEZ3) south of Al-Wakrah Municipality. Constructed in the form of an
Independent Power & Water Plant (IPWP), the prospective Dafabet Casino online plant has a capacity of 130 million imperial gallons per day. Kahramaa is simultaneously implementing a transmission pipeline to convey water
from the Dafabet Casino online plant to identified interconnection points of the Kahramaa central distribution system and Reservoir & Pumping Station (RPS) system.
Kahramaa is also laying two parallel desalinated water transmission pipelines (each 1,600 mm in diameter) to be interconnected, on a one-to-one basis, to two water delivery points extending from the pumping station of the Dafabet Casino online plant.
Activities
- Civil Works
- Communications and security systems
- Instrumentation
- Structural
Scope
- Detailed design
- Preliminary design
- Studies
Client
Sinohydro Tianjim Engineering Co. Ltd.
LOCATION
Dafabet Casino online
,doha
,project sheet
share this project