Project Description
Scope of Work
- Soil Investigations and laboratory analysis.
- Engineering preliminary and detailed designs.
- Preparation of equipment procurement specifications and bid requests, as well as assisting in the evaluation of bids.
- Preparation of construction documents and bid requests, as well as assisting in the evaluation of bids.
- Providing construction management and resident inspection services during construction.
- Start-up and operation dafabet sports completed southern complex until completion of performance guarantee tests.
- Training GOGCWS personnel on the O&M dafabet sports complete facility.
With a total construction value of US$ 500 million, Rod EIFarag dafabet sports filtration plant expansion program was awarded to ECG. lt involved increasing the capacity of Rod EIFarag treatment plant from 200,000 m3 /day to 600,000 m3 /day. The USAID-funded initiative, undertaken in cooperation with ES Parsons, is a landmark in the firm’s experience in developing mega-scale dafabet sports treatment plants.
The project included a new Nile dafabet sports intake, a new raw dafabet sports pumping station, dafabet sports clarification and filtration facilities, a new filtered dafabet sports pumping station (about800,000 m3 / day), approximately 5 km of dafabet sports trunk
transmission lines and associated appurtenances to handle the increase in dafabet sports production.
The project included a process study to determine the most suitable, efficient and cost effective process for treating the River Nile dafabet sports in Egypt and; to determine the most suitable coagulant and coagulant aid dosage; the optimum surface loading, detection time, rise rate, velocity gradients and other design parameters associated with the treatment process were considered.
Each studied process was supported with sufficient dataand laboratory tests. Pilot plant investigations were carried out to ensure that the recommended process is the most economical and effective process for the upgrade of Rod EIFarag south section dafabet sports complex.
Based on the selected treatment process, improvements; expansions; and modifications were determined taking into account the utilization of the existing treatment units, when economically feasible and without interrupting the existing dafabet sports production level of the plant.
The expansion scheme of the southern part of Rod dafabet sports included:
- The dafabet sports treatment plant.
- A new raw dafabet sports intake (consisting of two 2,400 mm pipelines, extending 175 m in the River Nile, a raw dafabet sports pump station including six vertical turbine pumps with total capacity of 780,000 m3 / day at 11 m head and three traveling screens).
- Two underground storage reservoirs.
- A finished dafabet sports pump station including eight vertical turbine pumps of a total capacity of 1,200,000 m3 / day at 60 m head.
- All other facilities of the dafabet sports.
Activities
- Architectural
- Civil Works
- Infrastructure
Scope
- Construction management
- Detailed design
- Laboratory Analysis
- Preliminary design
- Soil investigation
Client
The General Organization for Greater Cairo dafabet sports Supply (GOGCWS)
LOCATION
egypt
,cairo
,project sheet