AI Fujairah Dafabet bonus System

Project Description

To serve the city of Fujairah and its environs, a Dafabet bonus collection and treatment system was developed.

The Dafabet bonus collection network comprised 120 km of sewer pipes, 16 pumping stations, and 11 km of Dafabet bonus transmission mains. Meanwhile, 4.6 km of effluent transmission mains joined the Dafabet bonus
Dafabet bonus to the Mirbah Dam.

The implementation program was divided into two phases. Phase one involved the completion of the western and central parts of the Dafabet bonus collectionnetwork, pumping station no. 1, the Dafabet bonus pressure main (connecting pump station no.1 to the Dafabet bonus treatment plant), the effluent pressure main running to the Mirbah Dam, and the outlet structure at the Mirbah Dam.

In phase two, the remaining coastal strip connections of the Dafabet bonus collection network were conducted.

Activities

  • Civil Works

Scope

  • Concept design review
  • Detailed design
  • Shop drawings

Client

Bilfinger Berger AG (BB), Germany

LOCATION

al-Dafabet bonus

,

project sheet

Download File (pdf 429KB)