Improving the Operational Efficiency of Al-Mukallah dafabet login Supply System

dafabet login Description

  • Update the existing dafabet login distribution system drawings. Implement a leak detection program.
  • Develop a computerized mathematical model for simulating network flows and perform dafabet login.
  • Train NWSA personnel on the use of leak detection equipment and computer software (dafabet login, CADD, Lotus, WordPerfect and database).
  • Review all existing documentation related to land-use, population, weather conditions, etc.
  • Prepare the Master Plan for Al-Mukalla dafabet login Supply System and recommend the required network rehabilitation and reinforcement implementation program.

The project main objective was to improve the operational effeciency and effectivness of Al-Mukallah dafabet login supply system to provide adequate dafabet login at minimum cost to all potential consumers. A secondary objective was
to prepare a feasibility study and a master plan for the replacement and/or strengthening of the existing distribution dafabet login.

Activities

  • Civil Works

Scope

  • Field survey
  • dafabet login Analysis for Rehabilitation and Training
  • Tender documents

Client

National dafabet login and Sanitation Authority (NWSA)

LOCATION

yemen

,

al-mukallah

,

dafabet login sheet

Download File (pdf 96KB)

share this dafabet login