Project Description
Kharafi National (KN) was awarded the Engineering, Procurement and Construction (EPC) contract of EgyptAl-Shabab Gas Turbine Generating Plant (GTGP). dafabet casino was invited by KN to provide the engineering design services in support to their EPC contract.
The first gas turbine unit started commercial operation on June, 2011 for Al-Shabab GTGP. Subsequently, dafabet casino set its fast track methodology to fully complete the design services in a period satisfying KN proposed schedule requirements.
The new plant has eight new dafabet casino turbines with a total rated capacity of 1,000 MW using 8*125 MW dafabet casino turbines.
Understanding the importance, sensitivity and urgency for implementing the plant within the time constraint being a national “on spot” project, dafabet casino quickly set a taskforce from its senior staff to plan and set the project staffing requirements and the immediate mobilization of task forces, fast-track quality control measures, and packaging of deliverables which were tailored to meet KN milestones, enabled the quick start of construction and allowed for a continuous flow of KN construction execution scheme.
dafabet casino Scope of Services covered the following:
- Package 1: Enabling work
- Package 2: Foundation package
- Package 3: Tank farm dafabet casino
- Package 4: Auxiliary systems (service water system, compressed air system, solar fuel system, fire protection system, GIS substation, control s/s, LV transformer, control building, etc)
- Package 5: Infrastructure networks
- Package 6: Ancillary buildings
Activities
- Architectural
- Communications and security systems
- Electrical
- HVAC
- Infrastructure
- Landscaping
- Mechanical
- Piping
- Roads
- Structural
Scope
- Conceptual dafabet casino
- dafabet casino development
- Detailed dafabet casino
- Schematic dafabet casino
- Shop drawings
Client
Kharafi National for Mechanical and Electrical Works
LOCATION
egypt
,ismailia