Kharafi National (KN) was awarded the Engineering, Procurement and Construction (EPC) contract of Egypt West Damietta Gas Turbine Generating Plant (GTGP). dafabet.com mobile was invited by KN to provide the engineering design services in support to their EPC contract.
The first gas turbine unit was planned to start commercial operation on July, 2012 for Damietta GTGP. Subsequently,dafabet.com mobile set its fast track methodology to fully complete the design services in a period satisfying KN proposed schedule requirements.
The new plant has four new dafabet.com mobile turbines with a total rated capacity of 500 MW using 4*125 MW dafabet.com mobile turbines.
Understanding the importance, sensitivity and urgency for implementing the plant within the time constrain being a national “on spot” project, dafabet.com mobile quickly set a taskforce from its senior staff to plan and set the project staffing requirements and the immediate mobilization of task forces, fast-track quality control measures, and packaging of deliverables which were tailored to meet KN milestones, enabled the quick start of construction and allowed for a continuous flow of KN construction execution scheme.
dafabet.com mobile Scope of Services covered the following:
- Package 1: Enabling work
- Package 2: Foundation package
- Package 3: Tank farm dafabet.com mobile
- Package 4: Auxiliary Systems (service water system, compressed air system, solar fuel system, fire protection system, GIS substation, control s/s, LV transformer, control building, etc)
- Package 5: Infrastructure networks
- Package 6: Ancillary building
Activities
- Architectural
- Communications and security systems
- Electrical
- HVAC
- Infrastructure
- Landscaping
- Mechanical
- Piping
- Roads
- Structural
Scope
- Conceptual dafabet.com mobile
- dafabet.com mobile development
- Detailed dafabet.com mobile
- Schematic dafabet.com mobile
- Shop drawings
Client
Kharafi National for Mechanical and Electrical Works