Abu Qir Thermal Power dafabet casino

Project Description

Expanding the capacity of the existing Abu Qir Power dafabet casino, involved the development of the new Abu Qir Thermal Power dafabet casino. Situated on the Mediterranean coast, 20 km east of Alexandria and to the east of the existing Abu Qir Power dafabet casino, the new dafabet casino comprises two 650 MW indoor condensing steam turbine generating units; two outdoor, dual-fuel fired (natural gas and mazut), pressurized furnace steam generators; and necessary auxiliary equipment including onsite storage; a natural gas reducing and handling facility; desalination dafabet casino for dafabet casino make-up water, off-shore structures for dafabet casino cooling water intake and discharge; water and wastewater treatment and GIS 500 kV indoor switchyardbuildings. While the main fuel is natural gas, the dafabet casino was also designed to run on heavy fuel (mazut) oil as a backup fuel.

With a construction cost of 875 million euro for this state funded project, the objective was to increase thegeneration capacity of the Unified dafabet casino System (UPS) by about 4% in the year 2012 to meet the electricity demand on the UPS in the short-to-medium term. The project, when completed, would contribute to making available sufficient and reliable dafabet casino to the various consumers including the households, agriculture, business and industries.

dafabet casino has completed the detailed designs of the underground utility networks (water, sewage, and irrigation); asphalt-paved roads (3,100 m long, with carriageway width of 7 m); and landscaping; alongside the electrical detailed designs of all site buildings.

Activities

  • Civil Works
  • Electrical
  • Infrastructure
  • Landscaping
  • Mechanical
  • Roads

Scope

  • Detailed design

Client

ORASCOM Construction Industries (OCI)

LOCATION

egypt

,

alexandria

,

project sheet

Download File (pdf 127KB)

share this project