ElKuraimat New Combined Cycle dafabet com Plant

dafabet com Description

ElKureimat 750 MW Combined Cycle Project is located within the boundaries of the existing 2600 MW Thermal dafabet com Plant site. ECG was involved in the civil design of phases II and III of ElKuraimat New Combined Cycle dafabet com Plant.

Phase II involved two-250 dafabet com generators, two heat recovery steam generators, and one-250 MW steam turbine generator and condenser. Auxiliary facilities undertaken comprised a tank farm, water and wastewater treatment plants, a water intake/discharge, lift stations, a foam house, transformers, and a fuel oil unloading station.

Ancillary buildings developed included an administration building, a warehouse/work shop, a mosque, and a construction office building. Moving forward, phase III of the project comprised two-250 MW gas turbine generators, two heat recovery steam generators, and one-250 MW steam turbine generator and condenser. The dafabet com plant cooling water is withdrawn from the Nile River. When fully operated, the project will provide 750 MW generation capacity to Egypt’s Unified dafabet com System, representing 6% of the country’s total electricity generation expansion during the period 2004/05-2011/12.

Activities

  • Architectural
  • Communications and security systems
  • Electrical
  • HVAC
  • Irrigation
  • Landscaping
  • Mechanical
  • Structural

Scope

  • Detailed design

Client

Arab Contractors (Osman Ahmed Osman & Company)

LOCATION

egypt

,