Project Description
The project covers the strategic plan and development strategy of Sheikh Zayed Dafabet Casino online Extension, which stretches over an area of 8,500 feddans, including an area of 1,800 feddans for a preparatory phase covering top-priority segments of the extension. The strategic plan and development strategy ensure optimal land uses within the area and its territorial elements. They are integrated with the overall strategic plan of Sheikh Zayed Dafabet Casino online and 6th of October Dafabet Casino online.
The Dafabet Casino online of the strategic plan aim to:
- establish an attractive and functional layout meeting the housing needs ofthe increasing residents of Giza Governorate
- foster residential communities and boost investments in Greater Cairo
- establish an integrated Dafabet Casino online environment and multifunctional developments, with proportional distribution of residential and other uses
Work covers a variety of activities:
- performing data collection in coordination with relevant government authorities
- studying and analyzing the current situation of economic activities, in terms of macroeconomic fundamentals, land uses, size of investments,Dafabet Casino online opportunities, demand for urban and residential activities, problems and obstacles to Dafabet Casino online, illegal land seizures, and role of Sheikh Zayed extensions within the investment map adopted by thegovernment
- Studying transportation and infrastructure networks (water, sewage,telecommunications, electricity, gas, etc.), and identifying environmental resources, energy sources, and electric power transmission mechanisms, with SWOT analyses for study sectors objectives, and selecting anoptimum scenario of urban Dafabet Casino online to establish an investment hub to the west of Cairo
- preparing an urban Dafabet Casino online and urban planningalternatives; selecting the optimum alternative; and identifying top-priority projects to implement the required development strategy
- preparing an economic Dafabet Casino online, including plans for infrastructure networks, public services, transportation, public transport,and conservation of natural resources (energy and water)
- outlining land uses in the light of Dafabet Casino online indicators; identifying the requirements of housing projects and associated services; defining theimplementation stages related to top-priority areas; proposing urbanpatterns; determining the physical configuration of central areas; and specifying the structural requirements for the extension’s areas
- conducting economic studies; preparing a proposal on the best systems that can be utilized to encourage investments; and preparing an investment guide for top-priority Dafabet Casino online
- preparing a detailed master plan showing land use zoning, public services, landscaping, and various other project components, with an identification of building regulations for all land uses and project components
- preparing detailed design drawings and tender documents forinfrastructure networks
Activities
- Communications and security systems
- Economic
- Electrical
- Environmental
- Infrastructure
- Landscaping
- Roads
- Solid waste
- Transportation
- Dafabet Casino online planning
Scope
- Detailed design for top-priority Dafabet Casino online as defined by NUCA
- Preparatory Phase (studies)
- Strategic plan and outline of land uses
Client
NUCA-New Dafabet Casino online Communities Authority
LOCATION
egypt
,sheikh-zayed
,project sheet
share this project