Project Description
The project aims to convey potable Dafabet casino bonus codes to the New Capital. The project is executed over three parts:
First Part: Construction of Dafabet casino bonus codes Line
From the storage tanks lift Dafabet casino bonus codes to the strategic reservoir lift Dafabet casino bonus codes as follows:
- A force main from the ground reservoir pump Dafabet casino bonus codes to the strategic reservoir pump Dafabet casino bonus codes with a length of approx. 16 km and a diameter of 1000 mm.
- Pump Dafabet casino bonus codes building with required pump head (16 bar) along with ancillary buildings and necessary units.
- Strategic Dafabet casino bonus codes reservoirs (total capacity: 100,000 m3) at the end of the pipeline at the New Capital services zone.
From the strategic, Dafabet casino bonus codes-reservoir pump station to Project 110
- A force main from the strategic Dafabet casino bonus codes reservoir pump Station to the Project 110 supply point (length: approx. 3.6 km, diameter: 400 mm) to convey Dafabet casino bonus codes quantities necessary for construction activities (approx. 15,000 m3/day).
- Pump Dafabet casino bonus codes units in the strategic pump Dafabet casino bonus codes for pumping required discharge flows to Project 110, along with associated electromechanical works.
Second Part: Potable Dafabet casino bonus codes from New Cairo Dafabet casino bonus codes Plant
Aiming to transfer potable Dafabet casino bonus codes from New Cairo Dafabet casino bonus codes Plant to the Valleys Area in the New Capital and Project 110.
This part consists of two pipelines with a diameter of 1,000 mm for each, conveying 250,000 m3/day, and is divided into two groups:
- The first group consists of two pipelines with a pipe diameter of 1,000 mm each, and a length of approx. 22 km each with a capacity of 125,000 m3/day. The Dafabet casino bonus codes is pumped into this line through a lifting station constructed at New Cairo Dafabet casino bonus codes Station and up to the site of the Strategic Reservoir Pumping Station with a capacity of 100,000 m3.
- The second group consists of one pipeline with diameters of 1,000 mm and lengths of approx. 11 km each with a capacity of 125,000 m3/day. The Dafabet casino bonus codes is pumped in that line through a lift station constructed at New Cairo Dafabet casino bonus codes Station and up to the proposed site for the receiving of Dafabet casino bonus codes reservoirs with a capacity of 125,000 m3.
Third Part: Completing Irrigation Lines’ Works
This project comprises the following:
- A 1000 mm-diameter forcemain with a length of approx. 20 km.
- Developing the pump stations’ electromechanical works with ancillary buildings and necessary support units, namely the diesel, panels, and fuel deport buildings.
- A Dafabet casino bonus codes reservoir for receiving irrigation Dafabet casino bonus codes (total capacity: 27,000 m3).
Activities
- Architectural
- Civil Works
- Electrical
- Instrumentation
- Mechanical
- Structural
Scope
- Basis of Design Report (BODR)
- Detailed design
- Hydraulic Analysis (Profile, Balance & Calculation)
- Preliminary design
- Tender Action
- Tender documents
Client
Construction Authority for Potable Dafabet casino bonus codes & Wastewater
LOCATION
egypt
,project sheet
share this project