dafabet com Prevention Scheme (FPS-Phase3) for Doha South Areas (C2/850) dafabet com Prevention

dafabet com Description

The project covers the design services of dafabet com Prevention Scheme (FPS-Phase3) for Doha South Areas (C2/850), including Mamoura, Abu Sidra & Al-Mearad, Old Airport & Nuaija, Ain Khalid and Al-Wakra. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works. The main components of the network are as follows: semi-perforated pipes with porous trench of diameters ranging from 300 mm to 1,000 mm, and length of approximately 50,220 m; solid pipes with diameters ranging from 400 mm to 1,200 mm, and length of approximately 12,091 m; and trench soakaway with length of approximately 250 m. The project also includes a pump station, an Emergency Flooding Area (EFA), and underground tanks.

Activities

  • Architectural
  • Civil Works
  • Communications and security systems
  • Electrical
  • Instrumentation
  • Mechanical
  • Structural

Scope

  • Detailed dafabet com
  • Issued for construction
  • Preliminary dafabet com

Client

HBK – Hamad Bin Khalid Contracting Co. W.L.L.

LOCATION

qatar

,

dafabet com sheet

Download File (pdf 308KB)

share this dafabet com