Infrastructure Facilities for the Dafabet Casino online Capital City

Project Description

The project covers the strategic plan and development strategy for the Dafabet Casino online Capital City; including the following infrastructure components:

Combined Potable Dafabet Casino online and Firefighting Networks

The networks are located under the main streets; feeding the different project areas with the required amount of Dafabet Casino online through different sources including:

  • Dafabet Casino online Water Treatment Plant in the Dafabet Casino online Capital (1,500,000 m3/day): The treated water is transmitted to a storage tank located inside the borders of the Dafabet Casino online Capital.
  • Existing Dafabet Casino online in 10th of Ramadan City (180,000 m3/day): The Dafabet Casino online transmitted to a 100,000 m3-ground-storage-tank located inside the borders of the Dafabet Casino online Capital.
  • Existing Water Treatment Plant in Dafabet Casino online Cairo City (125,000 m3/day): The Dafabet Casino online transmitted to an 80,000 m3-ground-storage-tank located inside the borders of the Dafabet Casino online Capital.

Irrigation Network

The irrigation network feeds different project areas with the required amount of irrigation Dafabet Casino online. Following are the different sources of irrigation Dafabet Casino online:

  • Dafabet Casino online Main Wastewater Treatment Plant in the Dafabet Casino online Capital (200,000 m3/day): The Dafabet Casino online transmitted via 3 transmission lines.
  • Existing Dafabet Casino online (100,000 m3/day)
  • Existing Water Treatment Plant in Dafabet Casino online Cairo City (30,000 m3/day): The Dafabet Casino online transmitted to underground tanks which have a capacity of 42,000 m3.

Combined Sewage and Storm Dafabet Casino online Networks

The generated sewage and stormwater flow are collected from different project areas (parcels) for final discharge into the Dafabet Casino online Capital Sewage Treatment Plant; by means of main gravity pipeline. The design of the networks was based on storm water management.

Main Power Network

The total loads for Phase (1) is equal to almost 8.3 GVA, which are supplied by 19 main HV substations as follows:

  • 3 Main HV Substations (existing or under construction)
  • 16 Future Substations to feed the needed electrical loads through distributors

All connection points between loads/parcels and substations/distributors consists of Aluminum MV cables with a suitable cross section.

Street Lighting Network

Being a city that features smart technology, there are two types of lighting poles in the Dafabet Casino online Capital main and lateral roads; normal and smart lighting poles. The smart poles provide a range of services that encompass WiFi network, CCTVs, billboards, electronic signage, and amplifiers.

Telecommunications Network

Phase (1) will be served by 9 Network Nodes (N.Ns), which will accommodate the main Transmission, Optical Transport Network (OTN) in addition to N.N equipment.

Networks are designed to cover all outdoor areas of the city with smart and secure services. The design of telecommunications and smart networks is based on utilizing Air Blown Fiber System (ABF) technology to realize the following applications: Smart Pole Service; Facility Management Systems such as advertising, power, Dafabet Casino online, parking, lighting, and waste; Environmental Monitoring Stations; and ITS Intelligent Transportation.

Activities

  • Communications and security systems
  • Electrical
  • Infrastructure

Scope

  • Detailed design
  • Schematic design
  • Tender documents

Client

Dafabet Casino online Urban Communities Authority (NUCA)

LOCATION

egypt

,

project sheet

Download File (pdf 62KB)

share this project