dafabet mobile app Extension

Project Description

The project covers the strategic plan and development strategy of dafabet mobile app Extension, including an area of 1,850 acres for a preparatory phase covering top-priority segments of the extension.

dafabet mobile app scope of work comprises preparing detailed design for the following:

  • Combined Potable Water & Firefighting dafabet mobile app Sheikh Zayed water treatment plant. The estimated potable water required is 150,000 m3/day.
  • Sewage and Storm Collection dafabet mobile app.
  • Irrigation dafabet mobile app the TSE of the proposed tertiary sewage treatment plant and filtered backwash water.
  • Irrigation dafabet mobile app serving different areas of the public and private landscape through booster pumps and intermediate tanks.

The main electrical power dafabet mobile app with total loads of approximately 681 MVA. These loads are fed by the main HV substation through 53 electrical distributers.

  • Street lighting dafabet mobile app covering the main and lateral roads, and fed by street lighting pillars and dafabet mobile app.
  • Three telecommunication central offices and COCs located in the central axis road.
  • The infrastructure dafabet mobile app is designed to connect outdoor dafabet mobile app services with all project components, and provide the city’s outdoor areas with smart services. The design of telecommunication and smart networks is based on the technology of Air Blown Fiber System (ABF).

Activities

  • Communications and security systems
  • Economic
  • Electrical
  • Environmental
  • Infrastructure
  • Landscaping
  • Roads
  • Solid waste
  • Urban planning

Scope

  • Detailed design for top-priority projects as defined by NUCA
  • Preparatory Phase
  • Strategic plan and outline of land uses

Client

New Urban Communities Authorities NUCA, Egypt

LOCATION

egypt

,

sheikh-zayed

,

project sheet

Download File (pdf 577KB)