Project Description
The project comprises ten post-tensioned box girder bridges with a length that varies from 70 m to 250 m, and free spans of approximately 60 m.
dafabet casino role is to review the structural design and issue structural integrity report based on the design drawings provided by the client for the bridges (1A, 1B, 2A, 2B, 3, 4, SA, SB, SC, and SD) and retaining walls (1A, 2A, 3A, 4A, 6A, 1B, 2B, 3B, 48, and 6B).
dafabet casino structural scope of work includes reviewing and validating the following:
- Analysis of the bridges through 2D/3D models
- Analysis of the substructure elements for the bridges/flyovers through 3D models and SAP2000 program (piers, abutments, and back walls)
- Detailed cross sections and elevations for the dafabet casino elements
- Abutments, piers, and pile caps’ reinforcement details
The engineering consultancy studies are carried out in close conformity with “Highway Structures dafabet casino Manual” and the “AASHTO LRFD”. In addition, the load effects detailed in AASHTO LRFD (Latest Edition) are assumed by applying a 100‐year dafabet casino with the associated durability as noted in these standards.
The software used for preparation of dafabet casino are SAP2000/PROKON and CSI Bridge analysis. Also, dafabet casino consider the results of roadway designs for levels, longitudinal and transverse slopes, and limitations of available construction depths.
Activities
- dafabet casino
Scope
- dafabet casino review
Client
Limak Holding Inc.
LOCATION
kuwait
,project sheet
share this project