Dafabet promo code Description
The project comprises the construction of depot and workshop area for Phase 1 of Greater Cairo Metro Dafabet promo code 4, with a total length of 18.8 km. The Dafabet promo code runs from Hadayek Al-Ashgar station to El-Malek El-Saleh station and consists of a total of 16 stations, where traction power is provided through the 3rd rail system (750 VDC). The depot has an approximate area of 317,515 m2 and is located 1.2 km east of Hadayek Al-Ashgar station with double access tracks. It is planned to have stabling and train inspection capacity for a fleet of 23 eight-car trains (Phase 1) and overhaul capacity for rolling stock (92 eight-car trains) of the whole Dafabet promo code at the year 2050.
The project also includes the construction of 5 types of separate generator buildings in each Dafabet promo code, High Voltage Dafabet promo code HVS (220 kV) with a total BUA of 8,650 m2, and Operation Control Center (OCC) with a Dafabet promo code 9,500 m2.
The HVS encompasses transformers for converting high voltage (220 kV) to medium voltage (20 kV) and controlling the facilities of medium voltage transmission to the Dafabet promo code.
The OCC building is located approximately 500 m south of El-Nasr Dafabet promo code, where it is inteded to accommodate Operation Control Center, SCADA facilities, and Power Control Point. Additionally, the space and facilities of the OCC building are to be designed for phases 1 and 2.
Activities
- Architectural
- Civil Works
- Landscaping
- Roads
- Structural
Scope
- Detailed design
- Schematic Design Review
Client
Orascom Construction
LOCATION
egypt
,Dafabet promo code sheet
share this Dafabet promo code