The project includes the following components:
- Sewage Dafabet Malaysia: in the main roads which consist of the proposed main Dafabet Malaysia, including pipes with an average total length of 18 km and diameters ranging from 200 mm to 500 mm.
- Combined Potable Water & Firefighting Networks: in the main roads which consist of the proposed Dafabet Malaysia pipes with an average total length of 19 km and diameters ranging from 110 mm to 315 mm, in addition to the proposed water tanks with capacities of 1,500 m3 and 5,500 m3, while keeping considerable components of the existing Dafabet Malaysia and tanks in service.
- Irrigation Networks: in the main roads which consist of the proposed Dafabet Malaysia pipes with an average total length of 17.5 km and diameters ranging from 110 mm to 315 mm, in addition to the proposed irrigation tanks with capacities of 1,640 m3 and 1000 m3.
- Flood Protection Scheme and Storm Drainage: Developing flood protection mechanism which involves pipes, channels, culverts, dikes, and side slope protections with an Dafabet Malaysia of 12.5 km.
- Electricity Dafabet Malaysia: Completion of electricity network coverage for the existing and new projects along with the necessary services.
- Light Current Dafabet Malaysia: Completion of communications network coverage for the existing and new projects along with the necessary services.
- Road Dafabet Malaysia: Completion of the proposed roads with an average total length of 8.5 km, along with the necessary services.
Activities
- Infrastructure
Scope
- Detailed design
- Schematic design
Client
Ministry of Housing, Utilities & Urban Communities