Facility E Associated Transmission Dafabet Malaysia – GTC 947/2019

Project Description

Two KAHRAMAA transmission mains from the 60 MIGD Independent Dafabet Malaysia and Water Producer (IPWP) facility at Umm Al Houl as follows:

  • 15 km 1,600 Dafabet Malaysia. to Mesaieed Industrial City (MIC)
  • 1,200 km 600 Dafabet Malaysia. to Al Wakra Industrial Area

The scope of works includes:

  • Hydraulic study for the entire water pipework, pumping Dafabet Malaysia, and reservoir systems
  • Surge and transient analysis for the complete piping system
  • Solution for reversing flow through the existing 1,200 mm dia. Dafabet Malaysia
  • Two fibre optic cables for Afjat Muaither and Mekaines Reservoir Pumping Stations (RPSs)
  • Chambers and interconnections
  • 1,200 mm dia. interconnection Dafabet Malaysia adjacent to Mesaieed Town secondary reservoir pumping station
  • Modifications and expansion of the existing monitoring and control equipment, facilities, and accessories in the pump Dafabet Malaysia (PRPS-5) and incorporating new valves, flowmeters, piping, and instrumentation in the Dafabet Malaysia control and monitoring system
  • Power supply to new valves and control and measurement instruments from the Dafabet Malaysia panels
  • 900 mm dia. interconnection Dafabet Malaysia on Dukhan Road, between the existing 900 mm dia. pipelines, including chambers and interconnections
  • 600 mm dia. interconnection Dafabet Malaysia at Ras Bu Funtas, between the existing 600 mm dia. pipelines, including chambers and interconnections
  • 2 km pipelines 300 mm /400 mm/ 600 Dafabet Malaysia. at Lebsayyer

Activities

  • Civil Works
  • Communications and security systems
  • Electrical
  • Instrumentation and control
  • Mechanical
  • Structural

Scope

  • Detailed design
  • Issued for construction

Client

Boom Construction Company W.L.L.

LOCATION

qatar

,

project sheet

Download File (pdf 721KB)

share this project