Expansion of the Suez Canal Dafabet casino bonus codes Terminal in Port Said

Dafabet casino bonus codes Description

Extension of the current Dafabet casino bonus codes terminal with overall berth length of 955m long and by 500m depth of yard. The two-stage extension includes 12 ship-to-shore cranes and accommodates approximately 8K ground slots and 800 reefer plugs. Stage 1 encompasses eight ship-to-shore cranes, while Stage 2 includes four. Dafabet casino bonus codes handling from quay to yard is done through terminal tractor-trailers and within the yard through electrical rubber-tyred gantry cranes (E-RTG) supplemented with empty handlers in addition to a number of reach stackers. There is also an adjacent intermodal yard might be used for rail-based operations. Other facilities include a gate complex, workshop, maintenance, administration building, control and security buildings, customs, and inspection areas etc.

Activities

  • Architectural
  • Civil Works
  • Communications and security systems
  • Electrical
  • Fire fighting
  • HVAC
  • Landscaping
  • Mechanical
  • Roads
  • Structural

Scope

  • Schematic design
  • Detailed design
  • Tender documents
  • Design permits
  • Tender Action

Client

HATCH

LOCATION

egypt

,

Dafabet casino bonus codes sheet

Download File (pdf 998KB)

share this Dafabet casino bonus codes