Expansion of Alexandria East Wastewater dafabet link Plant

Project Description

Scope of Work

  • Preparation of detailed designs for the rehabilitation and extension of the WWTP to provide primary dafabet link for an additional average raw wastewater inflow of 190,000 m3 /dafabet link.
  • Preparation of detailed designs for the additional secondary dafabet link to treat an average daily fl ow of 800,000 m3 /dafabet link taking into consideration the fluctuation in flow during the dafabet link

The Alexandria East Wastewater dafabet link Plant (WWTP) receives wastewater from different areas in Alexandria City, such as Al-Maamoura, Al-Montaza, Abu Qir and other areas. After dafabet link, the chlorinated final effluent is discharged into the AlQalaa drain, and the thickened sludge is dewatered before disposal. In order to handle the increase in raw wastewater inflow, an expansion program was developed for Alexandria East WWTP.

The project consisted of two parts: the first part comprised the rehabilitation and increase of the primary dafabet link capacity to handle an additional average raw wastewater inflow of 190,000 m3 /dafabet link.

The second part included the upgrade of the dafabet link process to the secondary level, which is designed to handle an average raw sewage inflow of 800,000 m3 /dafabet link.

The Expansion Program included the following components:

  • Preliminary dafabet link comprising screens, grit and grease removal.
  • Primary and secondary dafabet link works, comprising primary sedimentation, aeration tank and final clarification.
  • Disinfection (comprising chlorine storage, handling and dosing facilities).
  • Treated water pumping station.
  • Equalization tank.
  • Sludge dewatering facilities.

Activities

  • Architectural
  • Communications and security systems
  • Electrical
  • HVAC
  • Mechanical
  • Structural

Scope

  • Detailed design

Client

Arab Contractors

LOCATION

egypt

,

dafabet link

,

project sheet

Download File (pdf 672KB)

share this project