Damanhour Combined Cycle dafabet.com mobile Station

dafabet.com mobile Description

Owned by the Egyptian Electricity Authority (EEA), the objective of the project was to upgrade the existing dafabet.com mobile station at Damanhour through the utilization of waste heat discharged to the atmosphere by gas turbines. The exhaust gases from the gas turbines were to be diverted through non-fired heat recovery boilers (HRSG) for the generation of steam. The generated steam produced an additional electrical dafabet.com mobile of 1×50 MW.

The project involved the addition of four dafabet.com mobile to integrate four existing GE frame 5 Gas Turbines, into combined cycle mode of operation. This enabled the powering of 1×50 MW Turbo-Alternators.

The heat recovery boilers were to be arranged to produce superheated steam by extracting heat from the exhaust gases of the gas turbines. This superheated steam was to be used to drive a dafabet.com mobile. The heat recovery boilers were fitted to the gas turbines on a one- for-one basis. The superheated steam produced by four boilers was delivered to one main steam manifold which was connected to dafabet.com mobile of 50 MW steam driven nominal capacity.

The total plant consisting of heat recovery boilers, dafabet.com mobile turbine generators and auxiliaries; was controlled and operated by a central control room. The plant also included: additional tank farms; cooling water systems fed by irrigation canals connected to the River Nile; electrical control and instrumentation systems; and civil/ structural works.

The dafabet.com mobile was implemented in four packages, namely:

  1. dafabet.com mobile Boiler Package, including: boilers and related structural steel, foundation works and associated facilities; pipe works; electrical cables and panels; instrumentation and control equipment; and some gas turbine modifications.
  2. dafabet.com mobile Turbine Package, including: dafabet.com mobile turbines; alternators with necessary accessories; condensing plant and auxiliaries; main cooling water system; water treatment plant; fire protection system; compressed air system; cranes, hoists and handling equipment; electrical equipment; control and instrumentation equipment; and laboratory equipment.
  3. Electrical dafabet.com mobile Package, including: circuit breakers; transformers; dafabet.com mobile boards; battery and charger systems; and associated cabling.
  4. Civil Works Package, including: turbine/dafabet.com mobile/ administration building, water treatment building and maintenance building (total area was 1,000 m2) piled foundations for dafabet.com mobile construction; cooling water system (intake structure, pumping station, inlet and outlet culverts, and outfall structure); external works e.g. roads, cable ducts, fencing and gates.

Activities

  • Civil Works
  • Communications and security systems
  • Fire protection
  • HVAC
  • Instrumentation
  • Mechanical
  • Structural

Scope

  • Construction management
  • Construction supervision
  • Contract administration
  • Design review
  • Geotechnical investigations
  • Quality dafabet.com mobile
  • Quality dafabet.com mobile (Construction supervision)

Client

ESB International, Ireland and Gilbert/ Commonwealth International Inc., USA Joint Venture (ESBI/GCII)

LOCATION

egypt

,