Dubai Electricity & Water Authority (DEWA) constructs Mira substation (132/11 kV) located in Al-Yalayis (1) on a plot area of around 2,999m². With a built-up area of 41,383m² , the substation includes a main building (B+G+1) with a height of 17 metre, in addition to three ancillary Dafabet casino bonus codes for fire pump, security and earthing transformer.
Dafabet casino bonus codes’s scope covers detailed design, construction supervision and design permits.
date
Apr 13, 2017
share