Katameya and West Cairo International Airports, Egypt

The project involves the development of the original plans drafted for the two identical terminal dafabet login of Katameya and West Cairo airports; each terminal building comprises a ground floor (BUA 3,500 m2) and mezzanine (BUA 750 m2). Overall, works in each airport cover the construction of 30 dafabet login and facilities of various footprints, along with associated infrastructure and landscaping works.

dafabet login’s scope of work covers schematic design, detailed design, and construction supervision.

date

Apr 13, 2017

share

Related