Abu Qir Thermal Power dafabet.com mobile Intake Structure

Project Description

Expanding the capacity of the existing Abu Qir Power dafabet.com mobile involved the development of the Abu Qir Thermal Power dafabet.com mobile. Situated on the Mediterranean coast,20 km east of Alexandria and to the east of the existing Abu Qir Power dafabet.com mobile, it comprised two-650 MW two indoor condensing steam turbine generating units; two outdoor, dual-fuel fired, pressurized furnace steamgenerators and necessary auxiliary equipment including onsite storage, a natural gas reducing and handling facility, desalination dafabet.com mobile for dafabet.com mobile make-up water, off- shore structures for dafabet.com mobile cooling water intake and discharge, water and wastewater treatment and GIS 500 kV indoor switchyard buildings. While the main fuel isnatural gas, the dafabet.com mobile was also designed to run on heavy fuel (Mazout) oil as a backup fuel.

ECG was awarded the quality control for this project which included, quality control for the ready mix concert dafabet.com mobile, preparing the quality control plan for the civil works, managing the quality control plan with the auditing boards, correction actions for the NCR and supervised all the works to be sure it matches with the quality control plan. The structure scope of work included the intake structure, intake operation building and discharge to seal well structure.

Activities

  • Civil Works
  • Communications and security systems
  • Electrical
  • Infrastructure
  • Mechanical
  • Roads
  • Wave breaker

Scope

  • Detailed design
  • dafabet.com mobile (Construction supervision)
  • Shop drawings

Client

Arab Contractors (Osman Ahmed Osman)

LOCATION

egypt

,

alexandria

,

project sheet

Download File (pdf 143KB)

share this project