dafabet casino Description
To serve the city of Fujairah and its environs, a dafabet casino collection and treatment system was developed.
The dafabet casino collection network comprised 120 km of sewer pipes, 16 pumping stations, and 11 km of dafabet casino transmission mains. Meanwhile, 4.6 km of effluent transmission mains joined the dafabet casino
treatment plant to the Mirbah Dam.
The implementation program was divided into two phases. Phase one involved the completion of the western and central parts of the dafabet casino collectionnetwork, pumping station no. 1, the dafabet casino pressure main (connecting pump station no.1 to the dafabet casino treatment plant), the effluent pressure main running to the Mirbah Dam, and the outlet structure at the Mirbah Dam.
In phase two, the remaining coastal strip connections of the dafabet casino collection network were conducted.
Activities
- Civil Works
Scope
- Concept design review
- Detailed design
- Shop drawings
Client
Bilfinger Berger AG (BB), Germany
LOCATION
al-fujairah
,dafabet casino sheet
share this dafabet casino