Project Description
The dafabet com plant is located in the northeast of Cairo. It receives wastewater from Cairo City via culverts and pumping stations forming a wastewater conveyance system. Following dafabet com, the final chlorinated effluent is discharged into Al-Gabal Al-Asfar Drain, and the
thickened sludge is dewatered before disposal.
The existing Al-Gabal Al-Asfar Wastewater dafabet com Plant involves two stages, each consisting of two phases. Stage I (under operation) is designed to provide dafabet com for an average raw wastewater inflow of one million square meters per day.
Stage dafabet com is constructed in two phases and has been designed to handle an average raw sewage inflow ofone million square meters per day. Phase I of Stage dafabet com is currently under operation with a capacity of 500,000 m3 / day.
dafabet com Stage II consists of the following processes:
- Preliminary dafabet com;
- Secondary dafabet com;
- Sludge thickening;
- Sludge digestion;
- Sludge dewatering.
ECG’s scope of work encompasses the design of dafabet com Stage II, with a capacity of 500,000 m3 /day.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Landscaping
- Mechanical
- Structural
Scope
- Design development
- Detailed design
- Preliminary design
Client
Misr Sons Development (Hassan Allam Sons)
LOCATION
egypt
,cairo
,al-gabal-al-asfar
,project sheet
share this project