Al Najaf Airport

dafabet Description

Engineering Consultants Group worked on this dafabet in a joint venture with Euroconsult, which involved reviewing preliminary design (PD) documents and preparing final designs and tender documents for the following components:

• Pavements and visual aids for the new Runway 09-27.
• Airfield dafabet and electrical enabling works.
• Electrical diversion works.
• Airfield dafabet systems for the new Runway 09-27 and associated taxiways, including related civil and power supply installations.
• Airfield dafabet substations.
• LV power supply to non-visual navigational aids.
• Street dafabet network for the airport’s perimeter roads.
• Telecom and ELV infrastructure and connection with existing systems at the dafabet limit of work.
• NAVAIDS and MET equipment for Runways 09-27, 10-28.
• Drainage, including designing the structures (5 culverts) between the runways and the pond, as well as a sleeve for crossing the taxiway, and a 2-box culvert for crossing the main runway leading to the pond.
• Sleeves for the firefighting system crossing the new runway and taxiways.

Activities

  • Communications and security systems
  • Electrical
  • Infrastructure
  • NAVAIDS and airfield dafabet, as well as metrological studies.

Scope

  • dafabet review for concept dafabet documents
  • Detailed dafabet
  • Schematic dafabet
  • Tender documents

Client

Al-Kawthar National Contracting & General Trading

LOCATION

iraq

,

najaf

,

dafabet sheet

Download File (jpeg 376KB)

share this dafabet