Dafabet Casino online Description
With a total capacity of 800,000 m3/day, the plant is considered one of the largest sewage Dafabet Casino online plants in Alexandria and serves around 4 million people. It is a huge and pioneering project with respect to generating electric power from solid waste; where the resulting sludge is digested to produce methane gas that is used to generate electric power, thus improving the environment and reducing emissions & energy use. The generated electricity covers about 60% of the plant’s energy consumption.
The Dafabet Casino online comprises two sludge mixing and transfer tanks (125 m3 each), Dafabet Casino online holders (5,000 m3), four-floor sludge digestion building (footprint area of 380 m2 and built-up area of 1,480 m2), digester tank (16,000 m3), digested sludge storage tank (2 x 1,250 m3), waste gas burner, biogas Dafabet Casino online unit, boilers building, and a powerhouse.
Activities
- Civil Works
- Electrical
- HVAC
- Mechanical
- Roads
- Structural
Scope
- Detailed design
- Shop drawings
Client
Arab Contractors (Osman Ahmed Osman & Co.)
LOCATION
egypt
,Dafabet Casino online sheet
share this Dafabet Casino online