Project Description
The project involves the development of the original plans drafted for the terminal building of Bardawil International dafabet app; the terminal building comprises a basement, mezzanine, and ground floor with a total built-up area of 8,000 m2.
Overall works in the dafabet app cover the construction of 27 buildings and facilities of various built-up areas, along with associated infrastructure and landscaping works:
Terminal building (dafabet app 8,000 m2)
• Administration building (dafabet app 720 m2)
• Air traffic control tower (dafabet app 1,500 m2)
• dafabet app maintenance building (bua 340 m2)
• dafabet app waste building (bua 107 m2)
• Electric substation building 1 (dafabet app 115 m2)
• Electric substation building 2 (dafabet app 480 m2)
• Primary airfield lighting building (dafabet app 220 m2)
• Secondary airfield lighting building (dafabet app 480 m2)
• Firefighting building (dafabet app 833 m2)
• Power station building (dafabet app 220 m2)
• Chiller yard (dafabet app 350 m2)
• Chlorination room (dafabet app 6 m2)
• Water tank (dafabet app 525 m2)
• Meteorology building (dafabet app 110 m2)
• Weapons storehouse (dafabet app 114 m2)
• Warehouse/ office building (dafabet app 120 m2)
• Security building (dafabet app 40 m2)
• Guard house (dafabet app 17 m2)
• Airside guard house (dafabet app 134 m2)
• Permissions building (dafabet app 106 m2)
• Housing facility (dafabet app 634 m2)
• Soldiers’ mess (dafabet app 316 m2)
• Bathrooms facility (dafabet app 55 m2)
• Employees’ motel (dafabet app 920 m2)
• Parking building (dafabet app 375 m2)
• Mosque (dafabet app 780 m2)
Activities
- Architectural
- Communications and security systems
- Electrical
- HVAC
- Infrastructure
- Landscaping
- Mechanical
- Structural
Scope
- Construction supervision
- Design review
- Detailed design
- Schematic design
Client
Military Engineers