Project Description
The project serves a total population of 15 million in the cities of Cairo; Giza; new urban communities around Cairo such as Badr, Shorouk, obour, 15 May and new Cairo; rural areas in Giza as well as current and future urban expansions in Greater Cairo and Shobra Elkhema area.
The master plan entails preparing a strategic plan to provide potable Dafabet free bet until the year 2037. ECG prepared five-year plans to improve the services of the potable Dafabet free bet networks with a view to meeting the increased demand and finding solutions for eliminating the load on the Dafabet free bet system infrastructure. The existing system comprises 16 major Dafabet free bet production plants with average daily production of 10 million m3/day, 575 ground Dafabet free bet
wells, 106 major pump stations, 84 Dafabet free bet reservoirs (elevated and ground tanks), 1,800 km of Dafabet free bet pipelines with diameters of 300 mm and 1,600 mm.
The project comprises the following stages:-
A) Data Collection and Evaluation Stage: Preparing Preliminary and Final reports. Raw data was collected and sorted in the form of databases and charts in such a way that allows predicting future expectations taking into consideration any possible changes to such data on five-year basis until the target year.
Data collection process was based on approved statistical records of the Central Agency for Public Mobilization and Statistics (CAPMAS), recent versions of urban planning maps approved by the Ministry of housing, utilities and urban Development. The basic information serving design
purposes included the following:
- Cadastral maps and contour maps with large scale layout (showing current and future urban boundary).
- Maps for potable Dafabet free bet transmission lines and distribution networks including data on pipelines and their diameters, types and status).
- Maps for other utilities (electricity networks, gas networks, telephone cables, railways, roads, Dafabet free bet streams, Dafabet free bet sewerage and drainage systems).
- Plans and urban studies including land use, current urban boundary, pivotal urban expansions and squatter areas.
- Demographic studies including population density and growth rates; the impact of population growth on economic and social development on the infrastructure.
- Dafabet free bet Sources: identifying potable Dafabet free bet permanent sources such as rivers, lakes and ground Dafabet free bet, inaddition to the impact of suction rates on Dafabet free bet quality, identifying Dafabet free bet sources and meeting demand on potable Dafabet free bet over the years of the plan.
The preliminary report included a methodological assessment of the current situation; the necessary works to secure Dafabet free bet supply systems according to the Egyptian Code and how the produced Dafabet free bet complies with the
standard specifications and quality assurance system.
After the preliminary report was approved, the final report was submitted and included development suggestions, estimation of the required works, estimated value and main duration for the implementation of Master Dafabet free bet over the five-year state plans until the target year.
B) Preparing High-Priority Project (HPP) documents for the coming five years:
Based on the discussion results, approval of both preliminary & final reports and financial budget available to implement projects for the coming five years, proposal documents for integrated works were prepared to
develop and raise the efficiency of potable Dafabet free bet stations, distribution networks in order to overcome operation problems and Dafabet free bet distribution network problems. This was based on the results of hydraulic analysis of networks using computer programs or similar software as well as results of the Dafabet free bet hammer study to conveyor lines in order to secure the service. The required works included:
- General and special conditions
- Technical specifications
- Preliminary drawings
- Bill of Quantities
- Estimated value for required works
C) Preparing Master Dafabet free bet until the target year 2037:
The Master Dafabet free bet included submitting studies and analysis of alternatives and giving recommendations on the most appropriate alternative. Also, the annual implementation proposals were submitted for the works in the scope of the Master Dafabet free bet and expected annual costs estimations.
This was presented in the form of a matrix for the works, recommended implementation durations as well as execution costs in such a way that would form a detailed executive and budget action Dafabet free bet.
The Master Dafabet free bet was prepared taking into consideration the urban expansions, current & future urban boundary in addition to the expectations of the study over five-year plans (2037-2007).
The Master Dafabet free bet included:
1. Studies on Potable Dafabet free bet Consumption
Studying potable Dafabet free bet consumption during the five-year plans until the target year showing the
bases considered to identify population growth rates and consumption rates (domestic, commercial and industrial).
2. Hydraulic Analysis for Future Situation
Based on the results of the hydraulic analysis of the existing situation for Dafabet free bet networks and estimations of future consumption rates, hydraulic models were developed in order to:
- Identify available alternatives in order to balance future Dafabet free bet demand against current Dafabet free bet production capacity.
- Suggest basic options for the development of potable Dafabet free bet networks, storage capacities and reservoir locations.
3. Detailed Description of Development Alternatives
A detailed description and design drawings were prepared to develop the following elements along with estimated costs for the alternatives:
- Production sources.
- Potable Dafabet free bet distribution networks.
- Pump stations and reservoirs.
4. Economic and Financial Studies
Economic and financial studies included the following:
- Economic costs for alternatives including investment cost for expansion works, support and rehabilitation comprising any costs for land, building, equipment, operation, maintenance and power.
- Comprehensive analysis of investment costs.
- Economic analysis of alternatives showing the adopted approach, cost estimations, interests in addition to technical and economic comparison of alternatives for the Master Dafabet free bet.
- Identifying the best alternative to develop the service and achieve objectives of the Master Dafabet free bet.
- Preparing project implementation Dafabet free bet and implementation time schedule over five-year plans until the target year (2037-2007), in addition to allocating the estimated cost of the expected annual works.
- Recommending Annual Expenditure Program.
Activities
- Civil Works
Scope
- Data analysis
- Data collection
- Demographic studies and studies of the demand on potable Dafabet free bet hydraulic analysis of potable Dafabet free bet distribution system
- Feasibility study
- Master Dafabet free bet
- Schematic design
- Tender documents
Client
Greater Cairo Dafabet free bet Company (GCWC)
LOCATION