Project Description
Cairo International Airport Terminal Dafabet Casino app 2 has undergone major expansion aimed at doubling its annual passenger handling capacity to 7.5 million passengers. The USD 400 million project was financed by the World
Bank.
With a built-up area of 228,000 m², the project involved the demolition of the existing Dafabet Casino app and construction of a new larger terminal, as well as construction of new airside and landside pavements, with a pavement area
exceeding 300,000 m².
The Dafabet Casino app now operates at a baggage handling
capacity of 3,000 bags/hour, with early baggage storage,
seven baggage reclaim carrousels, 51 metal detectors,
and 58 X-ray units. The Dafabet Casino app houses the latest airport
technologies and systems. Cairo International Airport Terminal Dafabet Casino app 2
Cairo International Airport Terminal Dafabet Casino app 2 Renovation Program
The construction of new facilities includes the following:
• Airside external work: earthwork, asphalt and concrete hard stands, civil works for potable water and sewerage networks, firefighting networks, storm drainage networks, fuel networks, as well as electromechanical works for
airfield lighting, apron flood lighting, in addition to different utilities’ networks.
• Dafabet Casino app (A): 5 floors with a built-up area of approximately
79,000 m2.
• Dafabet Casino app (B): 5 floors with a built-up area of approximately
102,000 m2.
• Dafabet Casino app (C): 5 floors with a built-up area of approximately 47,000 m2; and comprising 14 contact air gates, 28 passenger boarding bridges and 40 – room airside hotel.
• Landside external works: external utilities such as potable water, sewerage, firefighting, storm drainage and irrigation networks. External works also include asphalt roads and car parking with a total area of approximately 16,000 m2.
• Reconstruction of the existing power plant Dafabet Casino app: power supply including connection with existing Terminal Dafabet Casino app 2 power and distribution network through transformers and substations. Terminal Dafabet Casino app 2 shall be
provided with 3-phase 11 kV, 50 Hz power supply from the existing Dafabet Casino app power plant.
Activities
- Airfield lighting
- Architectural
- Baggage handling system
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Infrastructure
- Interior Design
- Mechanical
- Passengers Boarding Bridges
- Structural
Scope
- Conceptual design
- Construction management
- Construction supervision
- Detailed design
- Master plan
- Tender Action
- Tender documents
Client
Dafabet Casino app Airport Company (CAC)
LOCATION
egypt
,Dafabet Casino app
,project sheet
share this project