Cairo Metro Dafabet casino bonus codes 4 – Phase 1

Dafabet casino bonus codes Description

The project comprises the construction of depot and workshop area for Phase 1 of Greater Cairo Metro Dafabet casino bonus codes 4, with a total length of 18.8 km. The Dafabet casino bonus codes runs from Hadayek Al-Ashgar station to El-Malek El-Saleh station and consists of a total of 16 stations, where traction power is provided through the 3rd rail system (750 VDC). The depot has an approximate area of 317,515 m2 and is located 1.2 km east of Hadayek Al-Ashgar station with double access tracks. It is planned to have stabling and train inspection capacity for a fleet of 23 eight-car trains (Phase 1) and overhaul capacity for rolling stock (92 eight-car trains) of the whole Dafabet casino bonus codes at the year 2050.

The project also includes the construction of 5 types of separate generator buildings in each Dafabet casino bonus codes, High Voltage Dafabet casino bonus codes HVS (220 kV) with a total BUA of 8,650 m2, and Operation Control Center (OCC) with a Dafabet casino bonus codes 9,500 m2.

The HVS encompasses transformers for converting high voltage (220 kV) to medium voltage (20 kV) and controlling the facilities of medium voltage transmission to the Dafabet casino bonus codes.

The OCC building is located approximately 500 m south of El-Nasr Dafabet casino bonus codes, where it is inteded to accommodate Operation Control Center, SCADA facilities, and Power Control Point. Additionally, the space and facilities of the OCC building are to be designed for phases 1 and 2.

Activities

  • Architectural
  • Civil Works
  • Landscaping
  • Roads
  • Structural

Scope

  • Detailed design
  • Schematic Design Review

Client

Orascom Construction

LOCATION

egypt

,