Capital and Sphinx Dafabet Casino app Airports

Project Description

The project involves the development of the original plans drafted for the two identical terminal buildings of Capital and Sphinx Dafabet Casino app airports; each terminal building comprises a ground floor (BUA 3,500 m2) and a mezzanine (BUA 750 m2).

Overall, works in each airport cover the construction of the following 30 buildings and facilities of various footprints, along with associated infrastructure and landscaping works:

  • Terminal Dafabet Casino app (3,500 m2)
  • Airport maintenance Dafabet Casino app (340 m2)
  • Airport waste Dafabet Casino app (107 m2)
  • Fire-fighting Dafabet Casino app (1,280 m2)
  • Air traffic control tower (853 m2)
  • Airfield lighting system Dafabet Casino app (240 m2)
  • 2 Airfield lighting buildings (460 m2)
  • 2 Substations (235 m2)
  • Power station (220 m2)
  • Administrative Dafabet Casino app (720 m2)
  • Accommodation Dafabet Casino app (120 m2)
  • Guardhouse (17 m2)
  • Airside guardhouse (67 m2)
  • Water tank (525 m2)
  • Water treatment plant (2,314 m2)
  • Warehouse/office Dafabet Casino app (120 m2)
  • Chiller yard (350 m2)
  • Meteorology Dafabet Casino app (110 m2)
  • Equipment area (1,190 m2)
  • Security Dafabet Casino app (40 m2)
  • Weapons and ammunition depot (100 m2)
  • Permissions Dafabet Casino app (106 m2)
  • Meteorological hangar (7,316 m2)
  • Housing facility (160 m2)
  • Trained dogs facility (300 m2)
  • Bathrooms Dafabet Casino app (54 m2)
  • Mosque (670 m2)
  • Parking area (375 m2)

Activities

  • Architectural
  • Communications and security systems
  • Electrical
  • HVAC
  • Landscaping
  • Mechanical
  • Structural

Scope

  • Construction supervision
  • Detailed design
  • Schematic design

Client

Military Engineers

LOCATION

egypt

,

cairo

,

project sheet

Download File (pdf 650KB)

share this project