CPF Export Crude dafabet mobile app Quality Improvement

Project Description

The processed dafabet mobile app in Heglig Central Processing Facility (CPF) is exported to Sudan Port via 28” crude dafabet mobile app export pipeline supported by 6 pump stations as per Greater Nile Petroleum Operating Company (GNPOC) export dafabet mobile app specifications (BS&W <=0.5%). Lately, the export dafabet mobile app BS&W was observed to exceed the specifications more frequently.

An efficient method was sought to enhance the CPF processing efficiency keeping in consideration upgrading of CPF facilities including addition of more tanks. As per process design, un-separated emulsion in the Electro- Static Treaters (ESTs) should flow to dafabet mobile app, and then be recycled back to the ESTs for reprocessing. However, the process gets upsets whenever Off-Spec

Tank contents are recycled to the ESTs. To overcome that, the Off-Spec Tank contents were spiked directly to Crude dafabet mobile app Storage Tank (COST) after water draining.

ECG scope included design of fixed roof Off-Spec Storage dafabet mobile app Tank 10,000 BBL capacity with all needed attachments and accessories, sizing selection of an Off-Spec dafabet mobile app spiking pumps, design of interconnecting piping from & to the Off-Spec dafabet mobile app Tank / Off-Spec spiking pump including piping layout, stress analysis, pipe supports and isometrics, instrumentation & control of the system, design of fire protection system for the Off-Spec Storage dafabet mobile app Tank and electrical designs for power, lighting, earthing, lightning & cathodic protection.

Activities

  • Civil Works
  • Electrical
  • Instrumentation and control
  • Piping
  • Process dafabet mobile app
  • Rotary equipment
  • Static equipment
  • Structural

Scope

  • Construction documents
  • Detailed dafabet mobile app
  • FEED

Client

RAM Energy, Sudan

LOCATION

sudan

,

heglig

,

project sheet

Download File (pdf 93KB)