Project Description
ASHGHAL aims at developing Al-Wakra and Al-Wukair sewage treatment plant including the following components: Terminal Pump Station (TPS), screen shaft, pump shaft, odor control dafabet login, Treated Sewage Effluent Pump Station (TSE), Sewage Treatment Work dafabet login (STW), liquid treatment dafabet login, sludge treatment dafabet login, Treated Sewage Effluent dafabet login (TSE), TSE storage dafabet login, 6 deep injection wells, multi-purpose lagoons, ancillary buildings and dafabet login, and Kahramaa dafabet login.
The pump shaft and STW dafabet login are designed based on 2024 flow horizon with an average flow of 150,000 m3/day, while the screen dafabet login is designed based on 2045 build-out flow of 600,000 m3/day.
The site proposed for the TPS, STW, and subsequent future expansions is located approximately 35 km south of Central Doha and covers approximately 1,500 hectares (ha), where foul-dafabet login is transferred to the TPS and STW via the network.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Instrumentation and control
- Interior Design
- Landscaping
- Mechanical
- Process
- Roads
- Structural
Scope
- Detailed design
Client
JV of Calik Enerji, Metito Overseas Limited, and Elegancia Group
LOCATION
qatar
,project sheet
share this project