Project Description
The existing Ar-Rass Wastewater dafabet log in Plant is located in the northern west of Ar-Rass town in Al-Qassim province; one of the 13 regions of Saudi Arabia. The town is almost 400 km north of Riyadh and about 80 km
southwest of Buraydah, the regional capital of Al-Qassim Province. The project aims to design the second phase of Ar-Rass Wastewater dafabet log in Plant with a total capacity of 25,000 m3 /day.
The number of process and non-process facilities are expected to be 25 buildings on an area of approximately 100,000 m2.
The plant is designed to achieve carbon and nutrients removal. The dafabet log in facilities involve preliminary, primary, secondary and tertiary dafabet log in processes.
Ar-Rass dafabet log in system works as follows:
- The biological dafabet log in is based on Anaerobic/ Anoxic/Oxic (A2O) systems.
- Rapid sand filter is used for tertiary dafabet log in.
- Chlorine gas is used for treated sewage effluent disinfection.
- Gravity thickener and sludge centrifugal systems are used for sludge dafabet log in.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Instrumentation
- Landscaping
- Mechanical
- Roads
- Structural
Scope
- Conceptual dafabet log in
- Data collection
- Detailed dafabet log in
- Preliminary dafabet log in
- Tender documents
- dafabet log in alternatives study
Client
Saudi Ministry of Electricity & Water
LOCATION
saudi-arabia
,al-qassim
,dafabet log in-town
,project sheet