Diversion Dafabet bonus Design for Lusail Expressway

Dafabet bonus Description

Due to the rapidly growing development of Lusail City and it’s critical location, it was mandatory to construct diversion roads during the construction phase of the Lusail Expressway Dafabet bonus.

The detour Dafabet bonus’s length is approximately 3.5 km, connecting several important destinations in north Doha, it comprises a dual 2-3 lanes carriage way for each direction and intersections controlled by traffic signals and roundabouts. Design works include horizontal and vertical roads, signs, markings, surface water, street lighting and security surveillance systems.

The detour is designed as per international standards for permanent roads, achieving “level A” service. The Dafabet bonus’s alignment will be modified twice to suit the construction works sequence.

Activities

  • Architectural
  • Civil Works
  • Communications and security systems
  • Electrical
  • Roads
  • Structural

Scope

  • Detailed design

Client

Middle East Traffic Consulting LLC (Trafficonsult)

LOCATION

qatar

,

doha

,

Dafabet bonus sheet

Download File (pdf 237KB)

share this Dafabet bonus