Expansion of Alexandria East Wastewater dafabet Plant

dafabet Description

Scope of Work

  • Preparation of detailed designs for the rehabilitation and extension of the WWTP to provide primary dafabet for an additional average raw wastewater inflow of 190,000 m3 /dafabet.
  • Preparation of detailed designs for the additional secondary dafabet to treat an average daily fl ow of 800,000 m3 /dafabet taking into consideration the fluctuation in flow during the dafabet

The Alexandria East Wastewater dafabet Plant (WWTP) receives wastewater from different areas in Alexandria City, such as Al-Maamoura, Al-Montaza, Abu Qir and other areas. After dafabet, the chlorinated final effluent is discharged into the AlQalaa drain, and the thickened sludge is dewatered before disposal. In order to handle the increase in raw wastewater inflow, an expansion program was developed for Alexandria East WWTP.

The project consisted of two parts: the first part comprised the rehabilitation and increase of the primary dafabet capacity to handle an additional average raw wastewater inflow of 190,000 m3 /dafabet.

The second part included the upgrade of the dafabet process to the secondary level, which is designed to handle an average raw sewage inflow of 800,000 m3 /dafabet.

The Expansion Program included the following components:

  • Preliminary dafabet comprising screens, grit and grease removal.
  • Primary and secondary dafabet works, comprising primary sedimentation, aeration tank and final clarification.
  • Disinfection (comprising chlorine storage, handling and dosing facilities).
  • Treated water pumping station.
  • Equalization tank.
  • Sludge dewatering facilities.

Activities

  • Architectural
  • Communications and security systems
  • Electrical
  • HVAC
  • Mechanical
  • Structural

Scope

  • Detailed design

Client

Arab Contractors

LOCATION

egypt

,

dafabet

,

dafabet sheet

Download File (pdf 672KB)

share this dafabet