Project Description

The objective dafabet mobile app project is to develop a Master Plan for the phased development dafabet mobile app Greater Cairo waterworks from 1977 through the year 2000.
The Master Plan covered domestic, industrial and irrigation needs of the served areas up to the year 2000, when the population was expected to grow from the present level of over 8 million to about 16 million inhabitants. Accordingly, the consumption was expected to increase from the present level of 2 millions m3 /day to 8 millions m3 /day. The study also included the development of high priority projects to be implemented immediately as remedial measures to improve the present conditions in areas not adequately served by the existing systems. This system consisted of about 2,500 km of mains and branch lines, and several dafabet mobile app treatment
plants and pumping stations. The area dafabet mobile app project was largely extended since it covered all suburbs from Helwan in the South to Heliopolis and ElAbour in the North as well as the towns of Giza and Shoubra ElKheima.
The dafabet mobile app Master Plan study included the following:

  • Due to the lack of installed dependable flow measuring equipment, accurate measurement of dafabet mobile app flow and pressure at dafabet mobile app production facilities and in several areas of the distribution system were carried out by the Consultant using a Cole pitometer. Also,-24 hour flow measurements were made within each distribution network.
  • Inspection and evaluation of the condition of existing dafabet mobile app meters installed in-house and other connections. Inspection and evaluation of the meter maintenance, repair and calibration. Recommendations to upgrade dafabet mobile app metering system were presented.
  • A leakage survey program using sonic leak detection equipment in conjunction with metal detectors for locating leaks in pipes, valves & appurtenances. The survey includes dafabet mobile app 180 km of mains 400 mm diameter or larger. Measures for reducing leakage were recommended.
  • A dafabet mobile app wastage survey showed that the dafabet mobile app lost without benefit to the consumer after it has been delivered to him because of defective sanitary fixtures represents an appreciable percentage of the daily production.
  • Recommendations for a dafabet mobile app conservation program were prepared and presented to the Greater Cairo dafabet mobile app Organization.

Activities

  • Civil Works

Scope

  • Data collection
  • Economical study
  • Geotechnical investigations
  • Groundwater studies
  • Leak detection
  • Master plan
  • Social impact assessment
  • Tender documents
  • dafabet mobile app distribution system design (pipelines, pumping stations and reservoirs)
  • dafabet mobile app treatment plants design

Client

Ministry of Housing and Reconstruction

LOCATION

egypt

,