dafabet Description
The project is one of JODPs’ phases, with the prayer dafabet (Musalla) being a part of Phase III. It consists of two towers connected with the prayer dafabet from the east side; and located on the main pedestrian axis leading to the train station through the King Abdulaziz Parallel Road project, and ending with the Haram Square.
The prayer dafabet is linked to the two twin towers at the 37th, 38th and 40th floors (with an elevation of 40 m); at a height of 165 m above the ground. The main platform weight is 270 tons, while the final load is up to 400 tons; with an dafabet of 550 m2, and a capacity of 520 persons. It is a metal bridge entirely made of steel sections with truss system that was assembled at a height of 312 m above sea level, then lifted using special hydraulic jacks to the final level 473.5 m. It was designed to allow for the movement of the dafabet. Thus, the bridge’s possibility of bearing movement in some directions reaches approximately 1.0.m
dafabet considered a unique experience that is designed to offer a complete vision with panoramic view of the Ka’baa, and an audiovisual connection with the Holy Mosque, without any visual obstruction.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Landscaping
- Mechanical
- Roads
- Structural
Scope
- Construction supervision
Client
Jabal Omar Development Company
LOCATION
saudi-arabia
,mecca
,dafabet sheet
share this dafabet