Dafabet Malaysia Description
King Khaled Dafabet Malaysia Airport consists of three terminal buildings; two of which are for Dafabet Malaysia flights and the third is used domestically. The project’s scope is limited to the departure halls of the three terminals. As the number of departing passengers has increased significantly beyond the current design capacity of the terminals, increased security requirements took place and have led to the implementation of hold baggage screening before check-in. Consequently, congestion and long waiting time for passengers in the departure halls occurred. Therefore, it was decided to redesign/ rearrange all departure procedures areas to relieve the pressure of large numbers of passengers through three measures:
1) in line hold baggage screening (beyond check-in);
2) increase the Dafabet Malaysia check in counters;
3) increase the Dafabet Malaysia passport control as well as security screening.
Activities
- Architectural
- Communications and security systems
- Electrical
- HVAC
- Interior Dafabet Malaysia
- Mechanical
- Structural
Scope
- Conceptual Dafabet Malaysia
- Detailed Dafabet Malaysia
- Preliminary Dafabet Malaysia
- Tender documents
Client
General Authority of Civil Aviation (GACA)
LOCATION
saudi-arabia
,riyadh
,Dafabet Malaysia sheet
share this Dafabet Malaysia