Master Plan for East dafabet login Potable Water Transmission Mains

Project Description

The project aims at developing a master plan over a -6 month period for the transmission mains necessary to provide East dafabet login cities and urban communities, including the prospective Administrative Capital, with
potable water. The area of the study is bounded to the south by the dafabet login-Sokhna Road; to the north by Ismailia Canal; to the east by 10th of Ramadan City, Badr City, and the Provincial Ring Road; and to the west by the Ring Road. Master planning also covers the intake area of the New dafabet login water treatment plants on the banks of the River Nile in Tura, as well as the proposed pipeline routes extending from the intake to the proposed water treatment plant in the Administrative Capital.
The scope of consultancy services relating to the study comprises the following elements:

  • Data collection and verification for the water treatment plants, main and secondary distribution networks, transmission mains, and tanks, in collaboration with the council of each city, the New Urban Communities Authority, and the Greater dafabet login Water Company.
  • Recent GIS maps showing pipeline diameters up to600 mm for the cities covered by the master plan: New dafabet login, Administrative Capital, Al-Obour 10th of Ramadan, Al-Shorouk, Badr, and Al-Mostakbal.
  • Population studies for the cities covered by the study (about 10 million inhabitants).
  • Identifying current and expected dafabet login demand for the stages of the study, and specifying the target year.
  • Developing the network’s hydraulic model for East dafabet login cities and urban communities for possible integration with the system of digital maps and GIS programs at a later stage. The hydraulic model shall be developed following the provision of the latest versions of maps by the dafabet login Utility Data Center through the Construction Authority for Potable Water & Wastewater.
  • Full description of required works and suggestions of implementation. This includes the identification of development elements based on the results dafabet login integrated hydraulic analysis dafabet login networks and their accessories (pump stations, tanks, etc…).
  • Structural master plan for the main lines to illustrate the method of feeding the cities with potable dafabet login. This structural master plan is based on a masterplan for transmission lines and treatment plants leading to the transmission mains feeding the cities. It is also based on the hydraulic analysis of these transmission mains.
  • General description of treatment plants and transmission dafabet login including the identification of pump capacities necessary for pumping the required quantities.
  • Proposed primary routes of mains and their alternatives, as well as the locations of proposed treatment plants and transmission mains in accordance with the dafabet login.
  • Proposed primary routes and their alternatives for the mains likely to connect a number of treatment plants together, in accordance with the routes available for East dafabet login the cities and urban communities.
  • Final report of the dafabet login, as well as a cost estimation of proposed works up to the target year.
  • Identification of high-priority projects and their cost estimates.

Activities

  • Civil Works

Scope

  • dafabet login

Client

Construction Authority for Potable dafabet login & Wastewater

LOCATION

egypt

,

dafabet login

,

east-dafabet login-cities-urban-communities-including-the-administrative-capital

,

project sheet

Download File (pdf 167KB)

share this project