The main project comprises design services related to the water transmission system of Mountain Dafabet casino bonus codes Roads/Oxagon to the Red Desert (upper valley). Its aims at providing the necessary infrastructure to deliver water from Oxagon desalination plant to upper valley and consists of four pumping stations and a transmission line of DN 1,800 mm carbon steel pipes.
The project encompasses three Dafabet casino bonus codes roads: Dafabet casino bonus codes Road-2 (RD-2), Dafabet casino bonus codes Road-4 (RD-4), and Dafabet casino bonus codes Road-9 (RD-9). RD-2 has a length of approximately 14 km and runs through a valley located in mountainous area. This road is aimed to accommodate special trucks transporting 27-meter pipes and trucks transporting tunnel excavated rocks. RD-4 has a length of approximately 2.4 km to serve tunnel-2 and links with highway 80. RD-9 has a total length of 5 km and starts at bridge and is to be used for storm drainage from the flooded area in the foot of the mountain on the other side.
Activities
- Civil
- Electrical
- Roads
- Structural
Scope
- Conceptual design
- Design development
- Detailed design
- Tender documents
- IFC (Issued for construction)
Client
NEOM
LOCATION
saudi-arabia
,Dafabet casino bonus codes sheet
share this Dafabet casino bonus codes