Project Description
The multi-functional pharmaceutical dafabet com is constructed to be in compliance with the Good Manufacturing Practice (GMP) standards. It aims to enhance the local manufacturing of pharmaceutical products in order to meet the rapid increase in demand. The dafabet com is constructed on a total land area of 115,000m2 with estimated built-up dafabet com 41,000m2.
The project comprises dafabet com building, services building, prefabricated warehouse and associated facilities. The dafabet com building is composed of a ground floor and a mezzanine. The ground floor occupies an area of 22,500m2 that includes a production dafabet com 8,360m2, sterile rooms with an dafabet com 1,140m2, a warehouse with an dafabet com 5,750m2, a Research and Development (RD) laboratory with an dafabet com 1,800m2, in addition to other necessary facilities. The mezzanine floor occupies an dafabet com 16,140m2, comprises an dafabet com 12,290m2 for mechanical equipment, an administration dafabet com 2,020m2, laboratories of area 1,200m2 and other related facilities. The services building houses cooling towers, boilers and other electro-mechanical equipment serving the production area. It covers an dafabet com 1,730m2. The project facilities include, but not limited to, a maintenance workshop, an emergency diesel power dafabet com, water tanks, fuel tanks, an industrial waste treatment dafabet com, road network and parking facilities, a drip irrigation system, green areas and windbreaks. The dafabet com and the services buildings are connected together by a steel bridge, 120m long, to carry power lines and HVAC piping system (load 1.5 tons/m).
Activities
- Architectural
- Civil Works
- Mechanical
- Piping
- Process design
- Structural
Scope
- Construction management
- Construction supervision
- Cost estimation
- Detailed design
- Site Survey
- Soil investigation
- Tender Action
- Tender documents
Client
Medical Union Pharmaceuticals (MUP)
LOCATION
egypt
,abu-sultan
,project sheet
share this project